Specific examples of typical Field Development and Facilities Estimates are given showing the WBS and CEM formats on Figures 7 and 8 below.
Download sample Cost Estimate 1
Download sample Cost Estimate 1 (PDF, 0.11 MB)
Download sample Cost Estimate 2
Download sample Cost Estimate 2 (PDF, 0.09 MB)
Field Development Cost Estimate Report
The contents of the Final Report will contain at least the following, and provides all relevant data assumptions and exceptions as agreed with the Client.
- INTRODUCTION
- EXECUTIVE SUMMARY
- 1 Scope and Objective
- 2 Definitions and Terminology
- 3 Cost Estimate Methodology
- 3 Basis of Cost Estimate
- 4 Topsides Production Facilities (CAPEX)
- Engineering
- Procurement
- Construction (Fabrication)
- Offshore Installation
- Offshore Hook-Up and Commissioning
- Hand Over to Operations
- 5 Offshore Pipelines
- 6 Subsea, Umbilicals, Risers and Flowlines (SURF)
- 7 Floating Production Storeage Offtake (FPSO)
- 8 Owners Costs
- 9 Development OPEX
- 10 Development Decommissioning
- 11 Estimate Exclusions
- 12 Reference Documents
- 13 APPENDICES